Seeking funding

Palmiet River crossing

📍 Quarry Road West informal settlement,Durban (eThekwini Metro), KwaZulu-Natal

Palmiet River crossing

Who is affected

The informal settlement sits directly on the narrow floodplain of the Palmiet River. In 2022, debris blocked the bridge, causing overflow that flooded homes; residents formed human chains to escape. Multiple prior events (e.g., 2019) destroyed homes

What has happened at this site

2019 floods destroyed ~240 homes; 2022 floods caused severe inundation with bridge debris issues (extensively reported, including resident accounts and analyses of unheeded warnings). Classified as one of Durban’s most risk-prone settlements in the 100-year flood zone.

Public benefit when complete

1,083 households in Quarry Road West (four sub-sections: Mcondo 1/2, maMpondweni, maMsuthu) — roughly 4,000+ people directly; broader Palmiet catchment benefits from reduced isolation.

Your donation costs less than you think.

Bridging Africa is a SARS-registered PBO (930088666). Your donation qualifies for a Section 18A tax deduction, up to 10% of your taxable income per year.

Calculate your tax benefit →